Ceramic tiles quality inspection
Material type:
Item type | Current library | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|
Project Reports | UITU | 621.072 ADE (Browse shelf(Opens below)) | Available | CE-271 |
Browsing UITU shelves Close shelf browser (Hides shelf browser)
![]() |
![]() |
![]() |
No cover image available | No cover image available | No cover image available | No cover image available | ||
621.05 LAM Water Power Engineering | 621.05 SHA Power Plant Engineering | 621.05 SHA A Textbook of Power Plant Engineering | 621.072 ADE Ceramic tiles quality inspection | 621.072 ALI Single Phase Input and Output Variable Frequency Drive | 621.072 ALI Single Phase Input and Output Variable | 621.072 AZI PLC and Scada Based intelligent load Shedding management |
There are no comments on this title.